The plumbing was done in a day. They replaced the exhaust pipe, and moved the location of the gas and water pipes. We also decided to open up the skylight. The framing and the glass has been taken out so far. The plan is to replace the skylight and add small lights on the sides of the walls. First photo is the original picture.
Monday, November 10, 2008
Reframing & Plumbing
The plumbing was done in a day. They replaced the exhaust pipe, and moved the location of the gas and water pipes. We also decided to open up the skylight. The framing and the glass has been taken out so far. The plan is to replace the skylight and add small lights on the sides of the walls. First photo is the original picture.